Hungar has bought some farms.There is a river near the farm. It was found that linking these farms is more conducive for hungar. Therefore, he need to calculate that the minimum number of waterway he should build to connect all the farms, either connecting directly or not directly.There is not existing a waterway between river and farm,so you should also connecting them.
Print the number of waterway in one line.